The Planning and Regulations Committee of the DeKalb
County Board met on March 24, 2004 at 7:00 p.m. in the DeKalb County
Administration Building, Conference Room East. In attendance were Committee
Members Roger Steimel, Clifford Simonson, Marlene Allen, Howard Lyle,
Stephen Slack, James MacMurdo, Pat Vary, Eileen Dubin and Vince Faivre, and
staff members Paul Miller and Marcellus Anderson. Audience members included
Bob Drake, Director of Environmental Health for the County, Pat Dashney,
Solid Waste Coordinator for the County, Greg Milburg, DeKalb County Farm
Bureau and Dale Hoekstra, Waste Management Inc. Other audience members
included Carl Simonson, Jeremy Simonson, Matthew Simonson, Steve Kuhn,
Theresa Hughes and Diane Strand.
Mr. Steimel, Chairman of the Planning and Regulations
Committee, called the meeting to order. He noted that all Committee
members were present.
APPROVAL OF MINUTES
Mr. Simonson moved to approve the minutes of the February
25, 2004 meeting of the Planning and Regulations Committee, seconded by Ms.
Vary, and the motion carried unanimously.
APPROVAL OF AGENDA
Mr. Lyle moved to approve the agenda, seconded by Mr.
MacMurdo , and the motion carried unanimously.
SPECIAL USE PERMIT – Request of Shawn and Michelle
Frohn for approval of a commercial dog kennel on property located at 11622
Haumesser Road in Shabbona Township, Petition SH-04-03.
Mr. Miller began by reporting that Shawn and Michelle
Frohn, owners of the property at 11622 Haumesser Road in Shabbona
Township, have filed a petition for approval of a Special Use Permit to
allow the operation of a commercial dog kennel. The 8.86-acre subject
property is located on the east side of Haumesser Road, approximately
3,000 feet north of Lee Road, and is zoned A-1, Agricultural District.
DeKalb County Hearing Officer Ron Klein conducted a
public hearing on the request on February 26, 2004. The petitioners
presented evidence and testimony in support of the requested Special
Use, explaining that the scale of the boarding operation would be
limited to not more than 20 dogs at any given time. No members of the
public spoke in favor of or in opposition to the proposal. Mr. Miller
closed by noting that the Hearing Officer has forwarded his report and
recommends approval of the Special Use Permit, with conditions as noted
in the Findings.
Ms. Vary asked for a clarification on notification
regarding the public hearing. Mr. Miller confirmed that the usual
standards of notifying not only the adjacent property owners, but
property owners adjacent to the adjacent owners as well. A sign was also
placed on the subject property per the notification requirements.
Mr. Faivre moved to recommend approval of the Special Use
with the conditions as noted by the Hearing Officer, seconded by Ms. Vary,
and the motion carried unanimously.
Mr. Steimel noted that the matter would now be
forwarded to the County Board for consideration at its April meeting.
USE VARIATION – Request of Jeffrey and Deena Schell
for approval of a house on a ½ acre lot on the north side of Cherry Valley
Road in Kingston Township, Petition KI-04-04.
Mr. Miller noted that Jeffrey and Deena Schell, the
property owners, have filed a petition for a Use Variation for a ½-acre
parcel located on the north side of Cherry Valley Road, approximately
840 feet east of Snake Road, in Kingston Township. The request is to
allow the construction of one single-family residence on a parcel that
is less than 40 acres in size. The subject property is zoned A-1,
Agricultural District.
A public hearing on the requested Use Variance was
held by DeKalb County Hearing Officer Ron Klein on February 26, 2004.
The petitioners indicated that the ½-acre parcel has had a mobile home
partially on it since 1963. They also testified that the current
property owner acquired the property from the long-time owner, the
mother of one of the petitioners, and provided testimony from an
appraiser to the effect that the property would be more valuable if it
were buildable. They stated that allowing a single-family residence on
the property would improve the appearance of the site and be a benefit
to the County as a whole. No members of the public spoke in favor of or
in opposition to the request. Mr. Miller closed by noting that the
Hearing Officer has submitted his Findings and Recommendation, in which
he recommends denial based on failure to meet the specific requirements
for Use Variations. Mr. Miller reminded the Committee that in this
situation, should the County Board opt to approve the petition, it would
require a super majority 3/4 vote to override the Hearing Officer’s
recommendation.
Mr. Steimel asked Mr. Miller to review for the
Committee the criteria that were not met by the petition. Mr. Miller
replied that the current owner has not owned the property since 1993,
there was no evidence presented that a premium price was paid for the
property as a buildable lot when it was acquired, no evidence to
indicate that it would have been buildable under the terms of the Zoning
Ordinance in force at the time it was purchased, and finally there is no
evidence that the parcel pre-dates 1976 as a "lot of record." He went on
to note that the regulations of the Zoning Ordinance for nonconforming
lots indicate that in no case should a single-family residence be on a
lot of less than 22,000 square feet in area, and the subject property is
only 21,780 square feet. A final issued concerned the provision of water
and septic system for the property. Due to the small size of the parcel,
the only way the County could approve a new septic system would be if
the smaller lot used the well of the adjoining larger lot to the west,
currently owned by the mother of one of the petitioner’s. He closed by
noting that while this might be feasible currently, should either
property be sold, it could lead to well disputes in the future.
Mr. Simonson noted that this appears to be a clear
case of the petition not in any way meeting the required criteria and
therefore denial would appear the only reasonable response.
Mr. Slack asked Mr. Drake to clarify how he felt
about the proposed solution to the well and septic issues. Mr. Drake
noted that was not unheard of in the County for a house to use the well
of a neighboring property especially if the lots were owned by adjacent
family members. If this was done in this case, then the petitioners
would be able to meet the distance requirements to establish a sewer
system on the smaller lot. He added that the potential for municipal
septic and sewer would likely not occur for 20 to 25 years.
Mr. Doherty, attorney for the petitioners, identified
himself as well as the petitioner and his mother in the audience and
asked if the Committee wished to address any questions to them regarding
the petition. Mr. Steimel cautioned the Committee that only questions
related to information presented at the public hearing could be
addressed.
Mr. Steimel went on to comment that he felt there
could be quite serious future difficulties with the idea of two lots
sharing a well system. He noted that in the past, when one of the
parcels is sold, it seems to invariably lead to a dispute. He noted that
current regulations exist to prevent such inevitable disputes.
Mrs. Dubin asked for clarification on the issue of
whether Mrs. Schell was aware when she originally purchased the property
that it might not be buildable. Mrs. Schell responded that she didn’t
know one way or the other at the time she purchased the property. Mrs.
Dubin asked if Mrs. Schell had any knowledge of prevalent pricing for
buildable lots was at the time she made the purchase. Mr. Steimel
cautioned that this was not evidence presented at the public hearing,
therefore it was inadvisable for this line of questioning to continue.
Mr. MacMurdo moved to support the Hearing Officers
recommendation of denial, seconded by Ms. Vary.
Mr. Doherty commented that the appraiser that they
had brought to the public hearing has testified that it was his opinion
that the land cost seemed to support the belief that this was a lot with
mobile home and residential construction potential. He went on to note
that it was important for the Committee to consider that the family had
actually had two residences on these lots (due to the placement of the
mobile home) for over 40 years. All that was being asked was to replace
the mobile home residence with a more permanent structure. He closed by
noting that any concerns about a future well dispute could be addressed
by the construction of a very thorough and binding well agreement
document.
Mr. Steimel noted that it was the Committee’s
responsibility to review the information contained in the record of the
public hearing and to base their findings on that document as well as
the existing ordinances in effect.
Mr. Faivre commented that as he read the appraiser’s
testimony in the Hearing Officer’s report, he seemed to only say that
the lot would be "more" valuable "if" it were buildable. He noted that
this statement suggested to him that the appraiser did not consider this
purchased at the price of a buildable lot. Mr. Doherty commented that he
did not believe the record accurately reflected the appraiser’s
statements.
Mr. Slack asked again if there was any documentation
that had been presented at the public hearing that would support the
contention that the lot was purchased at a premium price. Mr. Doherty
responded that there was some information on comparables presented at
the hearing that he believed supported that contention.
Ms. Vary asked Mrs. Schell to specify what was
purchased for the $79,000 purchase price. Mrs. Schell commented that the
price covered two lots and one trailer.
Mrs. Dubin asked if the 20 to 25 year time frame for
sewers to reach this area was a reasonable assumption given the rate of
growth the County is experiencing. Mr. Drake commented that 20 to 25
years was the reasonable life for a septic system, and Mr. Miller added
that even with growth rates accounted for as projected by the Unified
Comprehensive Plan, it was still highly questionable that this area was
still unlikely to receive municipal services prior to that time.
Mr. Lyle noted that a house on the property would
certainly improve the aesthetics of the parcel. He asked if the issues
that have are causing concern would be eliminated if the mother would
sell the one-acre parcel to her son, thus giving him an acre-and-a-half
parcel. Mr. Miller noted that there would still be concerns about two
houses on an acre-and-a-half parcel.
The Committee returned to the original motion to support
the Hearing Officers recommendation of denial. The motion carried
unanimously.
SPECIAL USE PERMIT – Request of Theresa and Earl
Hughes for approval of a retail store in a barn on property located at 8329
East Sandwich Road in Squaw Grove Township, Petition SQ-04-05.
Mr. Miller began by noting that Theresa and Earl
Hughes have filed a petition for approval of a Special Use Permit to
allow a retail use to be conducted within and immediately adjacent to
existing agricultural structures that are no longer used for
agricultural purposes. The five-acre subject property, 8329 East
Sandwich Road, is located on the east side of the road, approximately
3,100 feet north of Bastian Road, in Squaw Grove Township. The parcel is
zoned A-1, Agricultural District.
The required public hearing was conducted on March 4,
2004 by DeKalb County Hearing Officer Kevin Buick. The petitioners
provided testimony and exhibits in support of the requested Special Use,
including that the business had been in operation on the property during
the past year. They indicated that the scale of the business would be
limited, and that the necessary parking spaces would be gravel. The
petitioners also submitted a petition in support of the request, along
with four letters of support. Seven members of the public spoke in favor
of the petition and none spoke in opposition. The Hearing Officer has
submitted his Findings, and recommends approval of the Special Use
Permit with conditions, as well as granting a Variation from the
200-foot lot width requirement for Special Use Permits.
Mr. Steimel asked Mr. Miller to discuss the
conditions being recommended. Mr. Miller responded that there were four
items included in the report. The first would limit the days and hours
of operation to Thursday through Sunday from 9:00 a.m. to 5:00 p.m..
Second, the use should be limited to the one barn only and not be
expanded into other buildings on the site. The final two conditions
noted that there be a site plan submitted and approved, and that the
operation be limited to the employment of only one additional employee
beyond the operator, Theresa Hughes.
Mr. Simonson asked if there had been any concerns
expressed about the amount of traffic this could generate. Mr. Miller
noted that there were no concerns addressed on that count and pointed
out that the business has already been in existence for a year prior to
making the Special Use application, thus giving the neighbors ample time
to assess any traffic concerns and make any complaints if they felt the
need to do so.
Mr. MacMurdo asked about the clause restricting the
operation to one employee given that this is a business that has the
potential for fairly wide seasonal fluctuations.. Mr. Miller explained
that this was a condition imposed to control the scale of the operation,
and that the condition was discussed with and agreed to by the
petitioner. He commented that the Hearing Officer took into account the
size of the building and the location of the site. Mr. MacMurdo then
asked if the Hughes had expressed any concern about that limitation. Mr.
Miller responded that they had not. He went on to comment that if the
operation does grow to the point that additional employees would be
required, the petitioner could come back to the County Board and ask for
an expansion of the Special Use.
Mr. Faivre commented that this seemed to be an
extremely difficult condition to actually enforce. He asked what the
County would do to assure that only one employee be allowed. Mr. Miller
replied that enforcement on issues like this are always problematic.
Typically, the items are controlled by neighbor complaints that alert
the office to the conditions being imposed.
Mrs. Allen noted that it was her opinion that the
physical limitations of the space would render it almost impossible to
have more than one employee functioning at any given time.
Mr. Faivre noted that additional security or parking
needs might appropriately necessitate additional personnel and it seemed
to him that restricting those options created an over-burdensome
condition on the property owner. He closed by noting that he believed
this condition should not be included with the Special Use.
Mr. Slack commented that he too had a philosophical
problem with limiting the number of employees and felt this was an
intrusion and over-regulation on the operation despite the good
intention of trying to limit the operation from growing larger than the
County might be comfortable supporting. He closed by noting that he also
strongly supported removing this condition from the Use.
Mr. Miller commented that another issue that could
arise from allowing an unlimited number of employees would be the
potential to cause inadequacy of the parking area for the operation.
Mr. Slack countered that such a decision should be the
property owners, not the County’s.
Mrs. Dubin asked how long the business had been in
operation prior to applying for the Permit. Mr. Miller responded that
the petitioner had ceased operations when they became aware that a
Permit would be required.
Mr. Simonson commented that he felt there should be
some restriction imposed on the business to force it to return to the
County for review and approval prior to expansion. He noted that
neighbors should be given the opportunity to speak to the impact of
expansion on traffic and parking.
Mr. MacMurdo moved to recommend approval of the Special
Use with the conditions as noted by the Hearing Officer, seconded by Mrs.
Dubin.
Mr. Slack moved to amend the motion to strike condition
"C" related to the number of employees, seconded by Mr. MacMurdo.
Mr. MacMurdo noted that it was the size of the
customer demand, not the number of employees, that should regulate the
size of the business. A business should have the flexibility to adapt
quickly to staffing needs or even more problematic difficulties could
arise.
Mr. Lyle commented that he could not see any reason
for a large expansion of employees and therefore, he felt there would be
no great reason to be concerned about too-rapid expansion.
The Committee returned to the motion to amend the
recommended conditions, eliminating item "C". The motion passed with eight
members in support and Mr. Simonson opposed.
The Committee then returned to the motion to recommend
approval of the Special Use with the amended conditions as noted by the
Hearing Officer. The motion passed unanimously.
Mr. Steimel noted that the matter would now be
forwarded to the County Board for consideration at its April meeting.
Ms. Vary asked if a 2/3 vote would be needed at the
County Board since the Committee had amended the Hearing Officer’s
original recommendation. Mr. Miller replied that this restriction would
not apply in the case of a Special Use.
LANDFILL LICENSE ANNUAL RENEWAL – Request of Waste
Management West for renewal of the annual license to operate the DeKalb
County Landfill on Somonauk Road in Cortland Township, and End-of-Year
Report of Solid Waste, 2003, from DeKalb County Health Department.
Mr. Steimel recognized Ms. Dashney from the Health
Department to present the annual report on the Solid Waste Program. He
noted that her report would be followed by a report from Dale Hoekstra
from Waste Management Inc on the County Landfill license.
Ms. Dashney noted that the text of the report had
been included with the evening’s information packet, but she wanted to
highlight certain items. She noted that the comprehensive 2003 rate for
recycling was 49%. This figure is down somewhat from prior years. She
noted that two reasons for this were the levels of reconstruction being
done as well as the fact that the County’s largest recycler did not sell
the majority of the materials that were brought in. She went on to note
that many of the companies surveyed noted the state of the economy as a
reason that recycling was down.
She commented that the Department had several
successful collection projects over the year. The Tire Collection
project netted enough materials to fill nine semi-trailers and the Oil
Collection resulted in 7,300 gallons of oil being turned in. The
Department also held a recycling drive for athletic shoes to be used to
construct athletic field surfaces such as tennis and basketball courts.
This project was done in conjunction with Nike as well as McHenry County
and the County Recycling Education Program.. She noted that the
Recycling Education Program had participation from over 1,300 students
in the past year from kindergarten through fifth grade. She noted that
there had also been a continuation of the Earth flags program awarded to
local schools.
Upcoming projects for the year including a composting
workshop in April, another oil collection in June, and a computer and
electronics recycling event. Cell phones will also be collected in
conjunction with the local Rotary Club for distribution to Domestic
Violence programs. That collection is scheduled for August 14, 2004 at
the Farm Bureau.
Another project that was attempted was a "cans for
cash" program held at the apartments near the University where curbside
recycling is not available.
Mr. Slack asked why there was no curbside recycling
available to multi-family units. Ms. Dashney replied that there was
historically a difficulty with keeping trash separate from the recycled
materials. However, she noted that individuals in these facilities can
take their recycling to nearby drop off points.
Ms. Vary asked if they had ever considered a battery
recycling project. Ms. Dashney noted that batteries can be recycled at
the curbside if they are placed in a separate bag and clearly marked.
Mr. Steimel asked for clarification on the issue of
co-mingling recyclables. Ms. Dashney noted that DeKalb has adopted
single stream recycling and therefore allows for recyclables to be
co-mingled. Mr. Slack commented that it would be good for Waste
Management to do more advertising on this fact.
Mr. Steimel asked about the possibility of a written
reminder to the public noting what are and are not appropriate materials
for recycling. Ms. Dashney replied that they had printed a recycling
brochure, but it was a costly project and funding is extremely tight at
this time. She did note that they would use the local newspapers
whenever possible.
Mr. Steimel thanked Ms. Dashney for her report and
turned to Mr. Hoekstra for the Waste Management report on the landfill.
Mr. Hoekstra began by presenting an aerial photo of
the landfill site taken in April of 2003. He noted that such photos are
taken annually to do surveys of the site usage.
He noted that there are approximately 14.5 years
remaining on the life of the landfill at this time. The total volume of
trash taken into the site had reduced slightly from 2002 to 2003, with
80,245 tons in 2002 to 78,705 tons in 2003, including with 5,700 tons of
out-of-county trash. He noted that they can accept up to ten percent of
the overall volume in out-of-county trash with the current actual
average being between 7.5% to 7.8%.
He then reviewed the property lines and parameters
and noted how the areas for trash and for yard waste had been separated.
He further noted the areas that had been closed and capped. He noted
that the current active area is the northeast side of the site.
He commented that they have had good success with
their composting area which takes approximately 18,400 tons of
materials, break them down to 24,000 to 25,000 yards if material and
finally producing 12,000 to 15,000 yards for sale to a wholesale nursery
and groundcover operation. At this point the majority of the materials
are being purchased by Midwest Trading Co., Inc. from South Elgin, but
many local private landscapers as well as local homeowners purchase
materials as well.
He then spoke briefly on the operation of the
gas-recovery sites utilizing their main flare (visible from State Route
88). He commented that he is often asked why Waste Management did not
sell the gas produced by the site. He noted that while Waste Management
was one of the first operations to generate electricity from this sort
of gas production system, it had not proven to be very cost-effective
once federal tax credits for alternative energies were discontinued. He
noted that there was a potential to pipe electricity to a dedicated
user, but there were simply no industrial operations of sufficient size
near the facility in this county.
Mr. Faivre asked if there were test wells on the site
and if so, have the reading been coming back with acceptable levels. Mr.
Hoekstra replied that they have been frequently monitoring the ground
water on the site. This has become especially critical on the west side
of the facility due to activities that had been done on the site prior
to its acquisition by Waste Management. He commented that in the 1950's
the site had been a burn pit. This has resulted in some contamination of
the aquifer. He added that Waste Management has developed a plan in
cooperation with the Illinois EPA to address this. They are also using
tree plantings on the site to assist in leaching the groundwater. He
noted that they have seen a 5% to 10% drop in the contamination levels
by using this approach.
Mrs. Dubin asked if the 14.5 year life of the site
had taken into account the rate of anticipated future growth. Mr.
Hoekstra noted that they had not utilized broad projections. He noted
that it is also difficult to predict contracting competition from other
companies. He noted that currently some areas of the County sends only a
small amount of their refuse to the facility and are instead utilizing
competing haulers.
Ms. Vary asked what provisions Waste Management has
made to address debris from the site scattered by high winds. Mr.
Hoekstra replied that there have a series of portable wind screens that
are set up at the site as well as a temporary labor force kept on call
to recover any debris that escapes the screens.
Ms. Vary then asked about plans for the site after it
reaches its maximum capacity. Mr. Hoekstra replied that the company will
have a 30-year post-closure responsibility to work with the County to
return the land to some viable use. He noted Settler’s Hill in the
western suburbs as one example of a site converted to recreational use.
Mrs. Allen moved to approve the annual license renewal
for Waste Management, Inc., seconded by Mr. Lyle, and the motion passed
unanimously.
On an unrelated matter, Mr. Miller noted that he
would not be attending the April P&R meeting due to a professional
conference. Mr. Anderson will attend in his place.
Mr. Lyle moved to adjourn, seconded by Mrs. Allen , and
the motion carried unanimously.
Respectfully submitted,
_______________________________________
Roger Steimel, Chairman
Planning and Regulations Committee Chairman
KR/kr |